Concentrated nickel strike solution for adhesion preparation before the main nickel bath on difficult or critical parts. Sold manufacturer-direct from NickelPlatingPro with technical support on every order.
Buying several products? Include the product names and quantities in your quote request.
Made in USA
Free shipping
Technical support included
Good to know
About this product
Manufacturer-direct chemistry and support
Concentrated nickel strike solution for adhesion preparation before the main nickel bath on difficult or critical parts. Sold manufacturer-direct from NickelPlatingPro with technical support on every order.
If you are choosing between a kit, a ready-to-use bath, electroless nickel, or a strike, start with the job: part size, base metal, and whether you already own a tank, anodes, heater, or power supply. Email support before you order if that is unclear.
Commercial chemistry
Commercial supply & technical support
Overview & applications
Concentrated nickel strike solution for adhesion preparation before the main nickel bath on difficult or critical parts.
Operating parameters
Use the product-specific instructions and confirm unlisted temperature, pH, current density, agitation, filtration, anodes, and maintenance guidance before production use.
Available quantities
Retail sizes and commercial orders. Request 5, 15, 30, 55+ gallons, or a custom quantity by quote.
Documentation & support
Tell us your bath size, substrate, application, and expected usage so we can discuss process fit, recurring supply, and product-specific documents.
Restoration shops, repair work, makers, and small plating operations that need manufacturer-direct chemistry with real process support.
In the order
What you get.
1 gallon concentrate
makes 2 gallons
Setup
What you should know first.
Degrease, rinse, and use the correct activation for the base metal. Do not skip cleaning; most adhesion problems start there. Electroplating products need a suitable adjustable DC power supply and anodes unless the listing is electroless or a non-plating accessory.
How to start
A practical sequence.
The included product instructions are the controlling procedure.
01
Confirm this product matches the process you want: electroplating, electroless, strike, copper, or prep.
02
Clean and prepare the part. Nickel follows the surface you start with.
03
Follow the included product instructions for setup, temperature, and processing.
04
Rinse, inspect, and keep notes so the next run is easier to repeat.
The result
What to expect.
A useful nickel or copper result depends on preparation, bath control, and following the included instructions—not on the bottle alone.
Be realistic
What still matters.
Follow the label and SDS. Confirm unusual alloys or existing coatings with technical support before you process a valuable part.
Shipping
Getting it to you.
Free shipping is included with this product.
Need it for a job with a hard date? Confirm timing with support before ordering.
Safety
Read before use.
Use the label, instructions, and Safety Data Sheet. Technical support is included if you get stuck.